Precast concrete provides the edge needed to produce facilities faster and more efficiently, with greater durability and versatility.
Tindall’s precast concrete solutions for manufacturing construction cover a broad and varied range of requirements. Precast, prestressed framing systems are exceptionally efficient, providing long, clear spans and supporting heavy loads. Precast projects also reach completion faster and more economically than steel or cast-in-place. Partnering with Tindall early in the conceptual phase allows our expert team of in-house engineers to generate the most economical and high-performance solutions.
Despite record rainfall that would have brought other construction methods to a halt, Tindall completed this construction on schedule, creating eight total precast structures and over 1,000 components with a variety of aesthetics.
DiscoverThe Texas Division was the single source for design, fabrication, and erection of this complex project. The new construction spans across 170,000 square feet and includes double tees supporting hanging conveyor belts and miles of piping.
DiscoverTo accommodate very poor soil conditions, Tindall designed this structure with a light gauge steel roof supported by 120-ft. span prestressed girders connected to precast support columns to form a semi-rigid frame.
Precast, prestressed concrete framing systems promote cleanliness and help achieve federal government standards placed upon food processing facility design and construction.
For this food processing facility, Tindall developed a complex and creative total precast system to support the very heavy floor loads and meet stringent USDA requirements.
Precast construction offers food preparations and processing facilities many advantages, such as being naturally bacteria-, mildew- and stain-resistant, and complying with USDA & FDA Standards.
Tindall manufactured 79,000 square feet of insulated precast cladding panels that took only three weeks to erect. These panels contributed to the project’s goal of achieving LEED Silver certification while also creating architectural appeal
Tindall designed, manufactured, and delivered a 12' wide x 8' tall pedestrian tunnel in specialized 4-sided sections that allows safe egress from the plant to the parking lot.
For more information on these manufacturing construction projects, download the PDF below.