When it comes to utility products, Tindall creates complex underground systems in record time — and nobody embraces a challenge like our team.
In-stock and custom precast concrete underground products are delivered on time, ready for one-pass installation, and designed for maintenance-free performance.
Our greatest precast concrete utility products are just waiting to be designed and created for your next project. Tindall has the knowledge and experience to design and manufacture superior precast utility products that meet today’s most complex underground challenges and NQA-1 requirements.
Tindall precast utility products are perfect for wastewater and drainage structures, trenches, span systems, underground utility vaults, and firewall systems — but that’s only the beginning.
To bring this project to life, county officials needed a partner with production and lifting capacity, logistical solutions, and years of experience. That’s why they called Tindall.
DiscoverAfter getting involved in the beginning stages of the project, nearly every underground item from Tindall’s extensive list of utility products was used in the infrastructure of this facility.
DiscoverTindall and Avcon Inc. created a precast drainage slab that eliminated the loose aggregate associated with casting in a traditional angle frame, preventing future risk for jet engine damage from debris.
Tindall provided a cost-efficient precast rainwater cistern for an irrigation system at USC. Tindall designed, manufactured, and delivered a massive 24’ span x 10’ tall x 200’ long detention vault.
Tindall designed, fabricated, and delivered a specialized wood chip conveyor tunnel. The 400 LF of 11.5’-wide x 8.3’-tall three-sided tunnel was designed to withstand 10’ of earth load and 50’ of wood chips.
Tindall designed, manufactured, and shipped the 292-foot, 3-sided utility tunnel that would house the conveyor system for Weyerhaeuser Company’s 3rd stacker reclaimer unit in the U.S.
Tindall teamed up with long-time partner Park Construction Company for this major sewer project in Raleigh, NC, providing 10 collector vaults and 96 T-Series manholes for pipe sizes ranging from 54" to 72" and 10 collector vaults.
Receiving rave reviews from UVA, Tindall, Faulconer Construction, and Dewberry Engineering designed, fabricated, delivered, and installed 1,400 LF of leak-proof utility tunnel in a race against the clock.
For more information on Tindall’s utility products, download the Underground Products Catalog below.