More Project Information
- Compressed schedules, from design to erection
- Off-site manufacturing in controlled environments eliminates weather delays
- Total precast simplifies the design process, leading to accelerated timelines
- Eliminates the need for scaffolding, large crews, and congested job sites
- Erection requires only one crane and a small crew
- In-house engineering and R&D teams provide expert support
- Maximizes versatility with long spans and high load capacity
- Capable of withstanding high wind loads, seismic activity, and ballistic blasts
- Elevated precast concrete floor systems help protect expensive equipment while providing access for cabling
- Innate resistance to corrosion and fire
- Naturally mold and mildew resistant
- Thermal mass properties reduce energy consumption during the life of the structure
- Reduces waste generated by plant and on-site construction
- Lowers life cycle operating costs
- Recycled, regionally supplied, low-emitting materials
- Inherent energy efficiency
- Contributes to LEED certification
Get the latest Tindall news. Join our mailing list.