When Dollar Tree decided to create a new 1.5-million-square-foot distribution center (equal in size to 31 football fields under one roof), Clancy & Theys stepped up as the building contractor for the job. When the project was announced, Tindall contacted the contractor to present their precast insulated wall panel solution for the job. With extensive experience in precast warehouse construction and innovative precast concrete solutions, Tindall was eagerly welcomed aboard.
Owner
Dollar Tree
Architect
HBA Architecture & Interior Design
Contractor
Clancy & Theys Construction Company
Location
Cherokee County, SC
To create the 336,206 square feet of insulated wall panels for this project, Tindall first needed to convert the design from site cast to precast, a decision which saved the client considerable time and money. In fact, despite battling one of the rainiest seasons on record for the region, Tindall completed the warehouses construction within the tight 40-day schedule by utilizing two installation crews.
Tindall went above and beyond in the creation of this thermally efficient wall system. The 8” and 9” precast insulated wall panels for this distribution center construction project had an R-value that exceeded the requirements of International Energy Conservation Code. These massive panels rose up to 50 feet in height and stretched out to 15 feet in width. They were also load bearing for the roof structure and acted as shear walls.