When approached by a globally recognized colocation data provider to build this large data center on an existing campus, Tindall sprang into action. Tindall’s engineering staff quickly collaborated with the project’s design team to develop an efficient total precast structure that made optimal use of Tindall’s catalog of beam, column and wall members. The result was another high quality, mission critical structure, designed and constructed to provide a versatile and resilient space for the tenants’ valuable data. Through rapid deployment of its considerable engineering, production and field resources, Tindall was able to turn over a fully erected structure less than 31 weeks after receiving its contract.