Shem Creek Office & Parking Structure

buildings

Mixed Use

USA

South Carolina Division

Typically, the primary draws of Tindall’s total precast construction are the swiftness of installation, the ability to achieve precise design requirements, and the strength and durability of the materials. While all of these elements held true for the Shem Creek Office and Parking Structure, one advantage outshone all the others — the ability to create and seamlessly blend a huge variety of aesthetic elements into a single striking total precast creation.

Shem Creek side of Office Structure with sun glare on window

Owner

AVTEX Commercial Properties

Architect

Stubbs Muldrow Herin Architects

Contractor

Thompson Construction Group

Location

Mt. Pleasant, SC

It’s What’s On the Outside That Counts.

Total precast concrete parking structure construction projects, such as the four-story, 121,400-square-foot Shem Creek Office Building, are unusual for this area. However, since a parking structure was needed beneath the office building, and due to its inherent ability to withstand the coastal environment, precast concrete just made sense. After the construction project began, it became clear that a precast concrete building system was the way to go, since it was versatile enough to tackle all the aesthetic demands of this build.

Given the area of this construction, blending with the surrounding setting was crucial. The Shem Creek parking structure needed to seamlessly meld with its surroundings while simultaneously presenting a modern flair that elevated the aesthetic appeal of the area. To achieve this, Tindall utilized wood grain form liner, brick inlay, and colored concrete with sandblasting — meeting all of the visual criteria with just precast concrete. Sandblasting was used to expose the aggregate, giving it a tabby-like appearance, and deep shadow lines were used to exactly mimic wooden shiplap. The blend of these modern and rustic aesthetic touches resulted in a visually stunning construction that is a testament to Tindall’s ability to provide creative solutions to unique challenges through precast concrete.

Street view of Shem Creek Office Building
Drone shot of Shem Creek Office Building with sunset and bridge in background
Details of Shem Creek Office Building Wall Panels
Sidewalk with palm trees next to Shem Creek Office building made with precast concrete
Shem Creek side of Office Structure with sun glare on window
Precast Concrete Office building with parking structure connected at sunset

More Project Information

Specifications
  • 121,400-sq.-ft. building and parking structure
  • 234 parking spaces
  • 2 stories of office space
  • Features a range of aesthetic elements, including inlaid brick veneer
Finishes
  • Colored concrete with sandblasting
  • Woodgrain formliner
  • Brick inlay
Components

Get the latest Tindall news. Join our mailing list.