Erection of the new brewery began in the fall of 2013. The project consisted of eight total precast structures and over 1,000 individual precast concrete components with a variety of aesthetics. This included load-bearing insulated precast wall panels supporting double tee roof spans in excess of 90 feet to meet the brewery’s cold storage requirements and desire for maximum open work space.
Despite record rainfall and harsh winter weather, Tindall was able to complete the brewery ahead of schedule, in part because the project’s precast products were manufactured in climate-controlled environments. As a result, Sierra Nevada was able to move into their facilities and begin production sooner than expected, saving both time and money.