Prior to 2014, the Tryon International Equestrian Center (TIEC) site was a swath of rolling, open fields and verdant forest. Since then, the center has blossomed into an international hub for the world’s best equestrian athletes. TIEC is essentially its own town, and it welcomes guests and athletes 365 days a year to watch, dine, shop, and ride. In short, it’s the perfect place to express one’s love for horses and the sport. Tindall began manufacturing and delivering the initial infrastructure piece for this project in early 2014, and it is expected that the project will continue to grow and evolve for several years.

Tindall Corporation Utilities Precast Concrete Arch Culvert Tryon International Equestrian Center Mill Spring North Carolina

Owner

Tryon Equestrian Properties, LLC

Architect

Odom Engineering, PLLC

Contractor

Clary Hood, INC.

Location

Mill Spring, NC

The Power of Tindall.

TIEC is a unique project due to challenges associated with the constant design changes. Involved since the beginning of this project, Tindall has provided nearly every underground item that the company manufactures for use in the infrastructure of the facility. This began with a 36’ span x 7’ rise arch culvert for use at the entrance to the site. Tindall then started on the storm drain, sanitary sewer, and water infrastructure, designing and manufacturing over 400 storm drain structures, 75 sewer manholes, and 12 grease traps/hair interceptors. Tindall also provided a 10- and 6-foot sanitary sewer lift station, plus numerous water meters and BFP vaults.

Tindall Corporation Utilities Precast Concrete Sanitary Sewer Tryon International Equestrian Center Mill Spring North Carolina
Tindall Corporation Utilities Precast Concrete Storm Drain Tryon International Equestrian Center Mill Spring North Carolina
Tindall Corporation Utilities Precast Concrete Construction Arch Culvert Tryon International Equestrian Center Mill Spring North Carolina

More Project Information

Specifications
  • 36′ x 7′ rise arch culvert
  • Over 400 storm drain structures
  • 75 sewer manholes
  • 12 grease traps
  • Hair interceptors
  • 10- and 6-ft. sanitary sewer lift station
  • Numerous water meters and BFP vaults
Components
  • Arch culvert
  • Storm drain structures
  • Sewer manoles
  • Greaset traps/hair interceptors
  • Sanitary sewer lift station
  • Water meters
  • BFP vaults

“The Tindall team has been outstanding to work with, and they know how to service their customers; from estimating, scheduling, and delivery, all the way down to the truck drivers. My crews like using their products because they are easy to set and the cut-sheet they provide for each structure is extremely helpful. I would recommend Tindall to anyone that has infrastructure needs and wants to work with the most professional, reliable, and helpful precast team out there!”