More Project Information
- Proven to be more cost-effective than other construction solutions
- Long spans allow for more spaces in less square footage
- Can be designed to handle heavy vehicular loads
- Pre-topped double tees serve as finished surfaces, saving time and money
- Aggressive scheduling allows for earlier occupancy compared to other construction methods
- Precast manufacturing concurrent with foundations
- Wide range of textures, colors, forms, and projections can create unique structures and seamlessly blend with surrounding architecture
- Design-build capabilities enable unique rooftop amenity solutions
Get the latest Tindall news. Join our mailing list.